In Montana, any load that exceeds the legal size or weight limits requires an oversize/overweight permit before it moves. Below are the legal limits and the requirements that apply at each threshold.
1When you need a permit
A load is oversize or overweight once it passes any of these:
| Dimension | Montana legal limit | Permit if over |
|---|---|---|
| Width | 8 ft 6 in | Wider |
| Height | 14 ft | Taller |
| Length (combination) | 75 ft | Longer |
| Gross weight | 80,000 lbs | Heavier |
| Single axle | 20,000 lbs | Heavier |
| Tandem axle | 34,000 lbs | Heavier |
Rear overhang is limited to 4 ft and front overhang to 3 ft before it counts toward length, and any overhang must be flagged.
2Escort & pilot car requirements
| When the load reaches… | Montana requires |
|---|---|
| 12.5 ft wide | 1 escort (pilot car) |
| 16.5 ft wide | 2 escorts |
| 17 ft high | Escort with a height pole / pole car |
| 150 ft long | 1 escort · 200 ft → 2 escorts |
| 15 ft high or 16 ft wide | Route survey required |
3When you can travel
- Weekend travel allowed within dimensional limits.
- Holiday blackouts: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day.
4Superloads in Montana
A load is a superload once it exceeds any of these:
| Superload trigger | Threshold |
|---|---|
| Width | 18 ft |
| Height | 17 ft |
| Length | 150 ft |
| Gross weight | 100,000 lbs |
Superloads require a route survey and roughly 5 days of lead time for approval.
5Permit timing
- Standard single-trip: ~1 business day to issue.
- Superload: ~5 days (route survey + review).
- Validity: a single-trip permit is good for ~5 days.
Get the full cost of your load
FreightDeck estimates every cost on an oversize move — permits, escorts, police, route survey, engineering, and the truck rate — for your exact load and route, across all 48 states and Canada, up to superload size.
Price your Montana load free →The most complete heavy-haul cost estimator · 48 states + Canada · no card to start.
?Montana permit FAQ
When do I need an oversize permit in Montana?
Once a load exceeds any legal limit: 8 ft 6 in wide, 14 ft high, 75 ft long (combination), or 80,000 lbs gross.
When do I need a pilot car in Montana?
Montana requires one escort at 12.5 ft wide (two at 16.5 ft), a height pole at 17 ft high.
Can you drive an oversize load at night in Montana?
Travel windows are set on the permit in Montana.
What counts as a superload in Montana?
Over 18 ft wide, 17 ft high, 150 ft long, or 100,000 lbs gross. It requires a route survey and about 5 days of lead time.
How much does a Montana oversize permit cost?
The state permit fee depends on the load's size and weight. The full cost of a move also includes escorts, police, route surveys, engineering, and the truck rate, which vary by route. FreightDeck estimates all of it for your exact load — price your Montana load with FreightDeck →.
Sources
- https://mca.legmt.gov/bills/mca/title_0610/chapter_0100/part_0010/section_0240/0610-0100-0010-0240.html
- https://mca.legmt.gov/bills/mca/title_0610/chapter_0100/part_0010/section_0250/0610-0100-0010-0250.html
- https://www.law.cornell.edu/regulations/montana/Mont-Admin-r-18.8.601
- https://www.mdt.mt.gov/business/mcs/permits.aspx
- https://www.mdt.mt.gov/other/webdata/external/MCS/manuals/MT-Truckers-Handbook-Info.pdf